Dewatering underway as U.S. Army Corps prepares for periodic inspection at Tuttle Creek Lake
Dewatering is underway at the stilling basin below the dam at Tuttle Creek Lake. The U.S. Army Corps of Engineers began work Friday in preparations of it’s 5-year periodic inspection. Outflows at the lake were dropped to zero along with the subsequent lowering of the River Pond. It will remain that way for three weeks. [...]
The post Dewatering underway as U.S. Army Corps prepares for periodic inspection at Tuttle Creek Lake appeared first on News Radio KMAN.
